Highest and Best Use (HBU) Studies in Indonesia: Unlock the Full Value of Your Land and Assets
Idle land, under-used buildings and assets that only generate costs can become income. A JULIZAR highest and best use study identifies the option that is legally permitted, physically possible, financially feasible and delivers the highest value.
- Legal, physical, financial, maximum productivity
- 4 testsLegal, physical, financial, maximum productivity
- Advisory projects completed
- 65+Advisory projects completed
- Project coverage across Indonesia
- 11 provincesProject coverage across Indonesia
- Bilingual reporting
- EN · IDBilingual reporting
What Is Highest and Best Use?
Highest and best use is the most probable and most profitable use of a property: the use that is legally permissible, physically possible, financially feasible and maximally productive. The concept comes from valuation practice, but our HBU studies focus on the decision itself: which development option the owner should pursue.
An HBU study is often the step before a feasibility study. HBU selects the best option from several possibilities; the feasibility study then tests that option in detail.
When Do You Need an HBU Study?
- You own idle land and want to turn it into an income-generating asset
- An ageing building needs a decision: refurbish, convert or redevelop
- Asset optimisation programmes for state-owned or private corporations
- Preparing asset partnerships such as build-operate-transfer or long-term leases
- Defining a development concept before buying or selling land
- Comparing several sites, or several concepts on one site
The Four Tests of Highest and Best Use
- 1
Legally permissible
Spatial plans (RTRW/RDTR), zoning, building coverage, floor area ratio, height limits, land title and permits.
- 2
Physically possible
Size, shape, topography, access, utilities and the condition of existing buildings.
- 3
Financially feasible
Market demand, sale or rental prices, construction cost and cash flow for each option.
- 4
Maximally productive
The option with the highest value (NPV, IRR, residual land value) is the highest and best use.
What We Analyse
-
Location and zoning
Accessibility, surroundings and regulatory limits on the site.
-
Economy and demographics
Regional growth, purchasing power and demand drivers.
-
Market research per option
Supply, demand, pricing and absorption for each development option.
-
Development options
Hotel, office, residential, retail, commercial, logistics or mixed-use.
-
Financial analysis
CAPEX, cash flow projections, NPV, IRR, payback and sensitivity analysis.
-
Partnership structures
The structure that best protects the owner’s interests, including investor partnerships.
How an HBU Study Works
- 1
Inception
Agree objectives, asset data and the initial options.
- 2
Site survey
Site inspection, physical condition and local market survey.
- 3
Screening
Options that fail the legal and physical tests are eliminated.
- 4
Financial testing
Remaining options are compared on value and risk.
- 5
Recommendation
The best option, a roadmap and next steps.
Selected HBU Projects
Highest and best use studies for state-owned enterprises and developers across Indonesia.
Kajian HBU di Setiabudi
Kajian Highest and Best Use atas lahan di kawasan Setiabudi, Jakarta Selatan, untuk PT Bina Konstruksi Abadi sebelum pengembangan fisik dimulai.
Highest and Best Use – Semarang Srondol Kulon
Highest and best use (HBU) study of land in Srondol Kulon, Semarang: legal, physical, financial and market tests to identify the most productive use.
Highest and Best Use Mataram – Jl. Majapahit
Highest and best use (HBU) study of land on Jl. Majapahit, Mataram, Lombok, comparing development options on zoning, market demand and financial return.
Highest and Best Use Banjarmasin City
Highest and best use (HBU) land optimisation study in Banjarmasin, South Kalimantan, producing an investor-ready development roadmap for the asset owner.
Often Combined with an HBU Study
HBU Study FAQs
How is an HBU study different from a feasibility study?
An HBU study compares several possible uses to find the best one. A feasibility study tests a single project plan in detail to confirm it is viable and bankable.
Is an HBU study the same as a property valuation?
No. A valuation gives an opinion of value for a specific purpose, such as collateral or financial reporting. Our HBU study is a development strategy: what should be built or done with the asset to maximise its value.
Can foreign investors commission an HBU study?
Yes. We prepare reports in English and explain the Indonesian zoning, land title and permit constraints that apply to each option.
How long does an HBU study take?
It depends on the number of assets, site size and options studied. We confirm the timeline in our proposal after an initial discussion.
Make your next investment decision on evidence
Tell us about your project. We reply within one business day with a proposed scope, methodology and timeline. Initial consultation is free.
Request a proposal
Share a short brief. Our consultants review every enquiry and reply within one business day with initial questions, a proposed scope and next steps.
- Initial consultation free of charge, by video call or in person
- Written proposal with scope, methodology, timeline and fee
- Confidentiality covered by an NDA on request