1. PBG: permit to build
The PBG is applied for before building or altering a building. Approval is based on meeting technical standards in the building's technical plan.
Our Services
Need help processing a PBG and SLF? PT Julizar Konsultan Indonesia helps building owners, developers, building managers, hospitals, and state-owned enterprises across Indonesia process the Building Approval (PBG) and the Certificate of Functional Worthiness (SLF), from checking requirements and preparing technical documents to supporting the application process.
Introduction
Building Approval (Persetujuan Bangunan Gedung, PBG) is the permit granted to building owners to construct, alter, renovate, extend, reduce, or maintain a building according to technical standards. PBG replaces the IMB (Building Construction Permit) in the current building permit system.
The Certificate of Functional Worthiness (Sertifikat Laik Fungsi, SLF) is a certificate stating that a building meets functional worthiness requirements in technical, structural, and safety terms. An SLF is obtained after the building is completed, and a building without an SLF should not be operated.
As a PBG and SLF consultant, JULIZAR helps building owners understand requirements, prepare technical documents, and guide the application so it runs in a more orderly way. With proper support, owners can focus on construction and operations while the administrative and technical permitting is handled by a team that understands the process.

When you need us
PBG and SLF processing services are generally needed in the following situations:
A complete PBG and SLF give legal certainty, support business permits, and help ensure the safety of building users.
Differences
Understanding the difference helps you plan permitting time and budget correctly.
The PBG is applied for before building or altering a building. Approval is based on meeting technical standards in the building's technical plan.
The SLF is obtained after the building is completed. This certificate states the building is functionally worthy in technical, structural, and safety terms.
A building's functional worthiness is inspected by authorized experts. We help prepare the building and documents for that inspection.
Application submission and monitoring are carried out through the building management information system (SIMBG), which we support.
Services
The scope of support is tailored to your building function, document status, and project stage.
Processing the Building Approval for new construction, from requirement checks to application submission.
Processing a PBG for alteration, renovation, extension, or reduction of a building according to technical standards.
Support completing the PBG for buildings already built, including adjusting technical documents to field conditions.
Processing the Certificate of Functional Worthiness after construction work is complete so the building is ready to operate.
SLF support for buildings already operating and preparation for SLF renewal.
Coordinating the technical inspection of building functional worthiness by authorized experts.
Checking the completeness of architectural, structural, MEP drawings and supporting documents before submission.
Support filling in data, uploading documents, and monitoring application status in the SIMBG system.
Support answering notes and revising documents from the verification and technical assessment process.
An estimate of the PBG levy based on building data and local regulations as material for budget planning.
An initial inspection of building condition to identify shortfalls before submitting for an SLF.
Processing for buildings with complex functions and systems across Indonesian regions.
Send brief building data and the location. We will check initial requirements and send a service quotation.
Benefits
Processing PBG and SLF involves technical documents, administrative requirements, and coordination with many parties. With a consultant, owners get clarity on steps and requirements from the start, so the risk of incomplete or nonconforming documents can be reduced.
A building with a PBG and SLF is more ready to operate, be leased, be sold, or be used as collateral for financing. Clear legality also protects owners from operational obstacles and the risk of sanctions under prevailing regulations.
We also connect PBG and SLF processing with other technical services, such as a building audit to identify building shortfalls before submitting for an SLF.

Clients

Process
A clear flow helps you know where your application stands at every stage.
Building function, location, and target.
Completeness of data and technical drawings.
Application through SIMBG.
Support with notes and revisions.
The PBG or SLF is handed to the owner.
Tell us about your building's condition. The first consultation is free, no obligation.
Requirements
Requirements may differ by region, function, and building area. In general, the following documents need to be prepared, and we help complete any gaps together with your team.
Time and cost factors
The more complete the documents from the start, the smoother the process. That is why we always begin by checking data before the application is submitted.
Risks
Missing permit documents are often only felt when a building is about to be operated, sold, or financed.
A building without an SLF should not be operated, so opening schedules and revenue can be delayed.
Differences between documents and the built structure create notes and revisions that add time.
Renovations or changes of function that have not been approved can cause legal problems later.
Incomplete building legality can complicate credit applications, sales, or leasing of the building.
Comparison
Each service answers a different need and is often used in sequence within one project.
| Services | Focus | Result |
|---|---|---|
| PBG | Approval to build or alter a building according to technical standards | The legal basis to start work |
| SLF | Functional worthiness of a completed building | The building is ready to be operated and used |
| Building Audit | Assessment of the condition and reliability of existing buildings | Repair recommendations before the SLF |
| Construction Management | Supervision of project quality, time, and cost | The building is completed according to the technical plan |
Advantages
| Status | Advantages | Explanation |
|---|---|---|
| Nationwide coverage | support for buildings across many regions | |
| Technical understanding | architectural, structural, and MEP documents are reviewed carefully | |
| Integrated services | connected with building audits and construction management | |
| Transparent process | application status is communicated regularly | |
| Direct communication | via WhatsApp and meetings in South Tangerang |
Investment
Fees depend on building function, area, and number of floors, document completeness, and the scope of support.
We provide a quotation after the initial brief. The first consultation is free.
Note that levies and technical inspection fees are a separate component from consultant fees. We help estimate them so your permitting budget is better planned.
Related services
View the JULIZAR portfolio or discuss your PBG and SLF needs directly.
FAQ
Ask our team directly.
A PBG is the permit granted to building owners to construct, alter, renovate, extend, reduce, or maintain a building according to technical standards. The PBG was previously known as the IMB (Building Construction Permit).
An SLF is a certificate stating that a building meets functional worthiness requirements in technical, structural, and safety terms, so it is fit to be operated or used.
A PBG is approval to build or alter a building according to the technical plan, while an SLF is issued after the building is completed and declared functionally worthy. In short, PBG relates to permission to build, SLF to permission to use.
PBG replaces the IMB in the current building permit system. It is processed through the building management information system (SIMBG) with emphasis on meeting technical standards.
A PBG is needed before constructing a new building and when altering, renovating, extending, or reducing an existing building. Detailed requirements can differ by building function and location.
A building without an SLF should not be operated. The absence of an SLF can hinder operations, business permits, and financing, and risks sanctions under prevailing regulations.
Generally owner data, proof of land rights, spatial use conformity documents, and technical plan documents such as architectural, structural, and MEP drawings with their calculations. Requirements can differ by region and building function, so we check them first in the initial brief.
Processing time depends on building function and area, document completeness, site conditions, and verification speed in each region. We give a time estimate once the building data is received.
Fees depend on building function, area, and number of floors, document completeness, and the scope of support. This cost is separate from levies and technical inspection fees. We provide a quotation after the initial brief, and the first consultation is free.
Yes. An existing building is generally first checked for conformity with documents and technical standards, then shortfalls are corrected before the PBG and SLF applications are submitted. A readiness audit helps identify shortfalls from the start.
Join the business owners and companies who trust JULIZAR for PBG and SLF processing. Sorry, we do not take voice calls; please leave a message.
PT Julizar Konsultan Indonesia, Roseville SOHO & SUITE, Sunburst CBD, Jl. Kapten Soebijanto Djojohadikusumo No.8 Lot I, Suite S-1009, Lengkong Gudang, South Tangerang, Banten 15321Discuss your project with us now. Free initial consultation.
Monday - Friday 08:30 - 17:00 (WIB)